How it works
Concrete is priced and poured by volume. Multiply length by width by thickness (all in the same units) to get the volume, then convert to whatever you need — cubic yards for US ready-mix, cubic metres elsewhere, or cubic feet to count bags. Always order a little extra for spillage and uneven ground.
1 yd³ = 27 ft³ · 1 m³ ≈ 35.31 ft³
bags = ft³ ÷ bag yield (0.30 / 0.45 / 0.60 ft³ for 40 / 60 / 80 lb)
Worked example
A 10 ft × 10 ft slab at 4 in thick is 100 ft² × 0.333 ft = 33.3 ft³, which is about 1.23 cubic yards. With a 10% allowance that is roughly 82 sixty-pound bags — enough that ready-mix delivery is usually cheaper at this size.